Skip to content

Merge pull request #21 from dachafra/main #1

Merge pull request #21 from dachafra/main

Merge pull request #21 from dachafra/main #1

Triggered via push February 13, 2025 10:11
Status Failure
Total duration 38s
Artifacts

test.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

11 errors
build (ubuntu-latest, 3.9)
Process completed with exit code 1.
build (ubuntu-latest, 3.12)
The job was canceled because "ubuntu-latest_3_9" failed.
build (ubuntu-latest, 3.12)
Process completed with exit code 1.
build (macos-latest, 3.12)
The job was canceled because "ubuntu-latest_3_9" failed.
build (macos-latest, 3.12)
Process completed with exit code 1.
build (windows-latest, 3.12)
The job was canceled because "ubuntu-latest_3_9" failed.
build (windows-latest, 3.12)
The operation was canceled.
build (windows-latest, 3.9)
The job was canceled because "ubuntu-latest_3_9" failed.
build (windows-latest, 3.9)
The operation was canceled.
build (macos-latest, 3.9)
The job was canceled because "ubuntu-latest_3_9" failed.
build (macos-latest, 3.9)
The operation was canceled.